Clinique CHC MontLégia

When planning this new Belgian hospital, great emphasis was placed on creating a pleasant environment for patients, staff and visitors alike. Thanks to a well thought out layout, the hospital achieves harmonious and efficient interaction between medical technology functions and clinical wards.

Modern hospital building exterior with glass windows at sunset sky

Facts about the project

  • Client

    Centre Hospitalier Chrétien, Groupe Santé CHC

  • Place

    Liège, Belgium

  • Status

    Completed

  • Size

    113 000 sqm

  • Photographer

    Nizar Bredan

Modern building atrium ceiling with skylight and circular pendant lights, geometric view upward
Modern hospital building courtyard with glass windows and rooftop planters

Integrated healthcare in a future ready hospital environment

MontLégia Hospital rises on elevated ground in the Belgian city of Liège, on a former mining site offering outstanding views over the city. The area also includes a care home for the elderly, laboratories and clean rooms for a biotechnology company, as well as the hospital’s administrative headquarters. The new hospital, with 720 inpatient beds and 120 outpatient places, brings together services from three older hospitals in the area.

Ahead of construction, high standards were set for accessibility and comfort – both for future patients and for healthcare staff – by promoting synergies between the different medical services.

Another key requirement was to separate maternity care from general hospital activities. This was achieved by creating a central medical‑technical building with two separate wings: one dedicated to maternity and paediatric services, and the other to adult care.

To enable easy adaptation to future needs, the number of internal partitions, load‑bearing walls and masonry elements has been minimised. The building is also designed to allow the addition of one extra storey, and in some areas even two. Ventilation ducts and electrical installations have likewise been prepared for future expansion.

Wards designed with patients and staff in mind

The wards have been designed following thorough consideration, to provide a comfortable environment for both patients and staff. Each unit is shaped like a cross, with service and staff areas located in the circulation core formed by the wings of the cross. This design reduces walking distances for staff, with the furthest room located approximately 25 metres from the main work area.

Patient rooms feature large windows with views of the surrounding landscape. The window is a central element of the room and is complemented by furniture that provides seating for visitors but can also be used as an extra bed for an accompanying person.

The window sills have been lowered so that patients can see life outside – not just the sky. This design choice has also made it possible to limit solar heat gain, which would otherwise often lead to overheating of both rooms and patients. As a result, external solar shading such as blinds or louvres has not been required.

On the ground floor of the ward wings, outpatient clinics are located and organised over two levels along an internal street.

  • Aerial view of modern hospital complex with parking lots and city skyline at sunset
  • Modern glass skybridge connecting hospital buildings under cloudy blue sky
  • Modern hospital building courtyard with blue glass windows and white facade, upward view
  • Modern hospital lobby with reception desk, waiting area, and large skylight windows
  • Surgeons performing operation in modern hospital operating room with medical equipment
  • Upward view of modern hospital building atrium with skylight and geometric windows
  • Modern empty lecture hall with tiered seating and large windows in hospital auditorium
  • Technicians working in sterile hospital laboratory cleanroom using glovebox workstations
  • Modern hospital building exterior with blue sky and entrance plaza pedestrians
1 / 9

Robust construction on historic mining land

As the clinic is built on a former mining site with large volumes of fill material, deep piled foundations were required to ensure structural stability. More than 2,600 piles, with an average length of 20 metres, were installed.

The building is also one of the first clinics to be constructed in accordance with the new European standard for earthquake‑resistant design, Eurocode 8 (EC8). Otherwise, it is a classic column‑and‑beam structure offering maximum flexibility.

Optimised energy performance with a focus on cooling demand

In terms of energy strategy, the focus was not on “green” energy production but on the building envelope and overall performance. Studies showed that the main challenge was not heating, but cooling. As a result, a very high level of airtightness was chosen, which also ensures excellent acoustic insulation – particularly important given the proximity to the motorway.

This has resulted in a building with a K‑value of < 36, which is very good for a building of this size and with such a high level of heavy equipment.

For cooling, the clinic uses a low‑temperature system operating at 10–15 °C, reducing electricity consumption by approximately 20 % compared with a conventional solution. Heat pumps have been installed between the heating and cooling systems to recover energy between the two flows.

Awards

Clinique CHC MontLégia is an internationally recognised project and was awarded the prestigious Best Healthcare Development prize at the annual real‑estate awards MIPIM in Cannes, in 2021.

Learn more about Sweco’s offer within healthcare architecture